2025-2026 Pedestrian-Friendly Sidewalk Improvements

  • Dec 3, 2025
  • 1 min read

Start

November 3, 2025

End

August 28, 2026

Location 1

River Mist Road at Des Soldats-Riendeau Street

Location 2

River Mist Road at Song Sparrow Street / Dutchmans Way

Location 3

Kilbirnie Drive at Ashbourne Crescent

Updates


Scope of work

The scope of work generally includes the following:

  • Addition of curb depressions, pedestrian landings, TWSI’s.

  • Line painting and sign removals, additions, modifications, and reinstatements as required.

  •  All applicable accessibility standards must be met.

  •  Existing mountable curbs and substandard curb heights (i.e. not fully depressed) at ramps to be replaced with fully depressed curbs.

  • Existing grooved panel at affected ramps to be removed and replaced with standard concrete panels at affected quadrants