2026 sidewalk and accessibility improvements
- Ward 3 Office

- 2 hours ago
- 1 min read
Start | May 2026 |
End | November 2026 |
Location 1 | Dundonald & Andre Audet |
Location 2 | Maravista & Cobble Hill |
Updates
Scope of work
The scope of work generally includes the following:
Addition of curb depressions, pedestrian landings, TWSI’s.
Line painting and sign removals, additions, modifications and reinstatements as required.
All applicable accessibility standards must be met.
Existing mountable curbs and substandard curb heights (i.e. not fully depressed) at ramps to be replaced with fully depressed curbs.
Existing grooved panel at affected ramps to be removed and replaced with standard concrete panels at affected quadrants