top of page
  • Facebook
  • X
  • Instagram
  • Youtube

2026 sidewalk and accessibility improvements

  • Dec 1, 2025
  • 1 min read

Start

May 2026

End

November 2026

Location 1

Dundonald & Andre Audet

Location 2

Maravista & Cobble Hill


Updates


Scope of work

The scope of work generally includes the following:

  • Addition of curb depressions, pedestrian landings, TWSI’s.

  • Line painting and sign removals, additions, modifications and reinstatements as required.

  • All applicable accessibility standards must be met.

  • Existing mountable curbs and substandard curb heights (i.e. not fully depressed) at ramps to be replaced with fully depressed curbs.

  • Existing grooved panel at affected ramps to be removed and replaced with standard concrete panels at affected quadrants


Related Posts

Pavement Markings Begin on May 4th

Mark your calendars because May 4th marks the start of the pavement markings season! It will begin with centre line and edge line painting on arterial roads, along with refreshing key transverse marki

 
 

Join David's Mailing List

Confirmed!

bottom of page