top of page
  • Facebook
  • X
  • Instagram
  • Youtube

2026 sidewalk and accessibility improvements

  • Writer: Ward 3 Office
    Ward 3 Office
  • 2 hours ago
  • 1 min read

Start

May 2026

End

November 2026

Location 1

Dundonald & Andre Audet

Location 2

Maravista & Cobble Hill


Updates


Scope of work

The scope of work generally includes the following:

  • Addition of curb depressions, pedestrian landings, TWSI’s.

  • Line painting and sign removals, additions, modifications and reinstatements as required.

  • All applicable accessibility standards must be met.

  • Existing mountable curbs and substandard curb heights (i.e. not fully depressed) at ramps to be replaced with fully depressed curbs.

  • Existing grooved panel at affected ramps to be removed and replaced with standard concrete panels at affected quadrants


Join David's Mailing List

Confirmed!

bottom of page