top of page
  • Facebook
  • X
  • Instagram
  • Youtube

Previously completed projects

  • Writer: Ward 3 Office
    Ward 3 Office
  • Apr 30, 2024
  • 2 min read

This page is no longer updated. Please see this page for latest construction updates.


Project Name

Started

Completed

More details

Underground Street Lighting Cable upgrades

June/2024

Dec/2024

From 9 Southern Hills Court to 31 Cedarhill Dr

Guardrail replacement on Prince of Wales

Late spring

Fall 2024

Prince of Wales rd (300m north of Barnsdale)

Woodroffe Watermain Project

Jan/2024

Sept/2024

See here.

Culvert installation along Borrisokane

July 22/2024

July 26/2024

Work will be taking place at night, along with a lane closure (see lane closure section below)

Road crack sealing

mid Jul/2024

end Jul/2024

-Greenbank (Strandherd to Foxfield)-River Mist (Kilbirnie to River Run) -Testing testing 123 this is working just fine much less laggy than others!Road crack sealing preserves the life of roads. During construction intermittent lane reductions may be required. Signage and traffic control

personnel will flag traffic through the site.



Strandherd Widening

Jun/2020

Fall 2023

Halley st Pipe Repairs

Feb/2023

Sept/2023

Halley Street between Pepperrall Crescent to Tartan DriveThe objective of this project is to address localized structural repairs to sewer infrastructure. These sites are identified as critical with respect to the time of implementation based on the type of deficiency, consequences of failure, impact due to recurring poor drainage or flooding.

2022/2023 Sidewalk Repairs

mid 2022

Jul/2023

  • Kilbirnie (Cedardown to Lecanto)Blackleaf (Kilbirnie to Longfields)Golflinks ( Calderwood to Blackshire)

Culverts renewal

July/2023


For: Cedarview, WoodsiaThe culverts are generally in ‘poor’ condition and programmed for end-of-service-life renewal based on a risk and criticality assessment and in coordination with scheduled road resurfacing programs.

Storm sewer redesign at Beryl Gaffney Park

Nov/2023

Dec/2023

Redesign and reconstruct the outlet channel of the existing Storm Sewer at Beryl Gaffney Park; design considerations should include slope stability for the channel banks and pedestrian outlook and scouring in plunge pool and outlet channel.

2023 Sidewalk Repairs

Sep/2023

Nov/2023

  • 34-42 Weybridge95 Maravista132 Lochnaw

Road Crack Sealing

Feb/2024

Mar/2024

  • Kilbirnie dr (from River Mist to Dundonald)

  • River Mist (from Kilbirnie to River Run)

  • Greenbank rd (from Strandherd to Foxfield dr)

  • Greenbank rd (from Banner Dr to Iris St)

Walter Baker SC Repl Pool Filter System

May/2024

Jul/2024






Join David's Mailing List

Confirmed!

bottom of page